How to Install a New Tile Floor

A fresh, new floor is one of the most popular ways to update a bathroom. In fact, floors are among the top three features to upgrade during a master bathroom remodel, with about 91 percent of renovating homeowners making an improvement to this area, according to Houzz research. But what’s involved? And can you do it yourself?

Tile Floor 1: Alexandra Crafton, original photo on Houzz

Related: Considering a Clawfoot Tub? Here’s How to Get a Freestanding Tub for Your Bathroom

For some homeowners, laying tile that you’ll walk on for years to come can elicit a great sense of pride. Others may find the process a bit overwhelming. Read on to determine whether you’d like to tackle this yourself or hire a pro.

Project basics: Installing tile involves stripping the floor down to the substrate, installing a backer board or underlayment, adhering the tile to the floor and grouting it. Depending on the material, sometimes a sealer is needed to protect the material from stains or damage.

It’s a good project for you if: You have the ability to lift 50 pounds, can work on your knees without trouble and don’t have back issues, says Chris Harper, general contractor and partner at Harper Construction in Charleston, South Carolina. You also need to be able to follow directions and have a decent amount of patience. “It’s simple,” Harper says. “But simple does not equal easy.”

Things to consider: Before you decide whether to DIY or hire a contractor, think about the pattern you want to install. Is it basic and fairly straight? Then you might be just fine trying your hand at a little tile-laying. Going for something more complex, with angles or curves involved? You might want to leave the headache to a professional. The idea here is to match your skill level, DIY confidence and tolerance for imperfections to the task. Some creative people find no tile challenge is too great. Others who are certain they’ll be annoyed by off-kilter or irregular grout lines may want to enlist the help of a pro.

Tile Floor 2: Howells Architecture + Design LLC, original photo on Houzz

Another thing to consider is the condition of your subfloor. Chris Chumbley, vice president of USI Design & Remodeling in Southlake, Texas, says that on the concrete slabs common in his area, you must be sure the floor is properly prepped and cleaned and any spiderweb cracks addressed before tiles go down. Also, “you want to make sure your floors are laid level,” Chumbley adds. If assessing these conditions is beyond your DIY depth, even after reading up on the process or watching a host of YouTube videos, you may want to call a professional.

“The bigger the tile, the more challenging,” says Joe Smith, general contractor at Owings Brothers Contracting in Eldersburg, Maryland. A larger tile is more likely to show imperfections since a 2-foot tile may bow over an unlevel subfloor, while a 1-inch tile would climb right over the floor’s curves.

Natural tiles cost more to install because you have to clean and seal them before you set them,” Smith says. “Glass and marble cost more because you have to prep [them] correctly.”

As you consider various tile options, also think about how well the type of material wears and how hard your family is going to be on it. Porcelain tiles wear “like steel,” Chumbley says, but limestone is more delicate.

Who to hire: A reputable tile setter or a general contractor who will oversee a tile specialist.

Basic steps: Decide what type of tile you want to install. You can get ideas in tile showrooms, magazines and photos and tile product shots on Houzz.

Next, consider the steps that will be involved, from demolition of the existing floors to any work that may need to be done to prep them for new tile installation. Leveling the floors and assessing any substrate issues is likely to be the most technical part of this project. Harper recommends consulting a general contractor who will “look at the structure of the subfloor and at all the angles to make sure what’s getting done is appropriate and will last for a long time.”

Tile Floor 3: Jay-Quin Contracting Inc., original photo on Houzz

How: It’s critical that you don’t install tile on old layers of linoleum, Harper says. Remove any old flooring and get down to the substrate. Needed repairs or leveling of the bare substrate come next.

Once the subfloor is ready, the next basic step is installing cement backer board or an uncoupling membrane. Both materials serve as the underlayer to the tile floor and help prevent cracks.

Tile Floor 4: Blank Page Design Build, original photo on Houzz

Joints should be staggered, not all lined up in a row, to make the floor more stable. “Once it’s all down, it’s a smart thing to go back and check everything and make sure all of those boards are secure by walking across and checking and making sure you have screwed things to the floor appropriately,” Harper says.

Next, mark out the tile layout. “Don’t start with the tile against one wall and go across the room,” Chumbley says. It’s better to start from the center of the room and work your way out. The layout of the tile is typically marked in chalk. The width and color of the grout are part of the aesthetics. The tile layer can use spacers to keep the tiles evenly apart as the pattern progresses.

Tile Floor 5: R.M. Buck Builders, original photo on Houzz

Finally, the tile may be set with mortar. Different types of tiles need different types of mortars or adhesives, so DIYers will need to research this and not grab the first can of mortar on the hardware store shelf. Typically, you need to let the mortared tile set for a day before grouting it. But there are some fast-dry adhesives that, if appropriate for the type of tile you are using, can speed up the process.

Once the tile is set, it’s time to apply the grout. You should take care to choose a grout that works with your particular material. “Glass can get scratched with grout,” Smith says. “There’s different grout for floors and shower walls.”

Tile Floor 6: JAUREGUI Architecture Interiors Construction, original photo on Houzz

Cost range: Labor, which varies greatly by region, may be charged by the square foot ($3.50 to $9) or the job ($300 to $600 per day for tile layers). The tile itself can cost $4 to $125 per square foot, and you also will need backer board or membrane, mortar and grout.

Typical project length:Three days, especially if demolition is involved. Cement board and mortar usually need a day each to set.

Permit: Often not required, but check with your local building department.

Best time to do this project: Since it’s indoors, any time of year is fine.

How to get started: Assess what your room needs and whether you will DIY. If not, find a good tile person.

By Erin Carlyle, Houzz

Housing Trends October 12, 2017

The 4 Phases of Remodeling: The Midproject Crisis

We recently covered the ins and outs of what I refer to as the Honeymoon Phase of construction. Next up is a stage similar to a concept most everyone is familiar with: the Midlife Crisis. (Whether you’ve experienced one or not is an entirely different story.) It often comes with questions like, “What am I doing? Where am I going? What is the meaning of life?”

Midproject 1: J Design Group – Interior Designers Miami – Modern, original photo on Houzz

Likewise, the second phase of a home remodel, which I fondly refer to as the Midproject Crisis, is paired with parallel questions: What’s my contractor doing? Are we still moving forward as planned? Was this really all worth it? And of course: What is the meaning of life?

Fear not: Your contractor is working hard, your project is moving forward and, yes, your decision to renovate your home is, and will be, worth it. I can’t really speak about the meaning of life, but I can speak about the experiences of homeowners and remodelers during this period of a remodel.

Related: The Reality of Living Through a Remodel

Midproject 2: Vivid Snaps Photography, original photo on Houzz

Typically, once demolition and framing is finished (the Honeymoon Phase) and before sheetrock is put up, mechanicals will begin. (This probably is referred to as “mechanical rough-in” or “mechanical rough” by your contractor.) Mechanicals refer to the guts of the house: electrical; plumbing; and heating, venting and air conditioning (HVAC). Like our own guts, most of the work done during mechanicals occurs behind the scenes.

So what is going on behind the scenes? Let’s break it down by type of work:

Midproject 3: Janet Brooks Design, original photo on Houzz

Electrical. The groundwork for all new light fixtures, outlets, switches and appliances will be done during this phase. New wiring will be run in the walls and ceilings, electrical boxes will be installed for future fixtures, and electrical panels may be upgraded so they can handle heavier loads (this is especially prevalent in remodels where appliances are added). At this point, electricians are making sure that everything that will need power will have access to it and meet your municipality’s building code.

Plumbing. As with electrical, plumbing rough-in ensures that all plumbing fixtures, appliances and other water features will be supplied with water, gas (if your house uses natural gas) or both. So pipes may be moved or installed in new places, shower pans (the things that make sure the water stays in the shower) are installed and inspected, and gas lines may be moved, extended or even put in.

HVAC. Unlike electrical and plumbing, HVAC is the only mechanical where nearly all the work is completed during the rough-in stage. Pathways for new vents (for bath exhaust fans or kitchen vent hoods) are determined and vents are installed, air conditioning units may be replaced, and air return vents are located in appropriate positions.

Midproject 4: Melbourne Contemporary Kitchens, original photo on Houzz

All this sounds exciting, right? No doubt, it is. But the progress isn’t as visual as it is in the Honeymoon Phase. Since everything occurs behind walls, under foundation or in attics, the big “wow” just isn’t there like it is when everything is torn apart.

It’s around this time that I’ve often seen homeowners concerned about progress. Yes, plumbers are there, but where are the new sinks? Why isn’t there a single light fixture installed yet? Is the HVAC guy even working, or is he just taking a nap in the attic?

The other contributing factor to the crisis is the fact that any speed bumps that crop up during this phase take a bit more time to resolve. Overall, the placement of existing framing is the biggest obstacle in mechanical rough-ins.

If your plans specify that there is going to be a can light in Location A, but Location A has a structural beam directly above it — no can do. Or say your architect has designated a toilet to be mounted on the wall instead of on the ground, but existing wall framing prevents this from being a viable option. Back to the drawing board. Or maybe your HVAC contractor needs to be able to provide ductwork to a new vent hood location in your kitchen, but there is no open attic space to place the ducts. Time to think through the alternatives.

Another obstacle, which is less common but should still be noted, is the condition of existing mechanicals. Any wiring, plumbing or venting that is found to be damaged, dangerous or just not up to par with your municipality’s building code will likely need to be remedied.

And don’t even get me started on inspections. If your job is permitted, inspections for mechanicals will occur during this stage. City building inspectors are (at least where I’m from) well known for being thorough. If you don’t have everything just right (which ultimately is good, because they’re looking out for your safety), they will not hesitate to make your contractor fix the issue before any work can continue.

Midproject 5: Kasper Custom Remodeling, LLC, original photo on Houzz

And finally, don’t forget to communicate with your remodeler. If you don’t understand something about mechanical rough-in (which is common), ask. If you’re concerned about the placement of pipes or wiring, say something. If you want an update on project status, request one.

I know it may be tempting to ask for advice from your neighbors who remodeled their house last year or your friend whose cousin’s husband is an architect, but in the end, the person with the most knowledge about your project is your building professional. See if you can get on your contractor’s schedule for a recurring biweekly meeting. It will help make the Midproject Crisis less of a crisis and more of an extended honeymoon.

So we’re halfway there. What’s next? Is the light at the end of the remodeling tunnel finally visible? When will your house start to look like a home again? What is the meaning of life? (I’ll tell you one last time — I can’t help with the meaning of life!)

But for more information on the next phase of a remodel, look for the next installment in this series: the Renewal of Vows.

By Hannah Kasper, Houzz

Housing Trends October 10, 2017

The 4 Phases of Remodeling: The Renewal of Vows

Passing the midway point of a remodel can be an exciting time. After weeks (or months, but hopefully not years) of being in a state of disarray, things finally start to feel as if they’re coming together.

You’ve experienced the fast-paced bliss of the Honeymoon. You’ve trudged through the slowdown that comes with the Midproject Crisis. And now? Now you’re ready to gaze lovingly into your contractor’s eyes again.

Vows 1: Priority 1 Project Management, original photo on Houzz

Everything you’d hoped and dreamed about when you first envisioned your project is coming true, and you’re feeling ready to say “I do” all over again. It’s time for the remodeling phase I like to refer to as the Renewal of Vows.

You probably won’t hear your contractor refer to this phase as such (but how fun would that be?). Just as the Midproject Crisis is more commonly referred to as the mechanical rough-in stage, this phase has other, more industry-standard names. You will probably hear words like “finish out,” “trim out,” “mechanical trims” or “finishes.”

And, as you can probably guess, this phase is about finishing and beautifying the work that was started in the first couple of months. There’s a lot that may (or may not) be involved in the finish stage of your job, depending on your scope of work, but here’s a list of the most common steps that happen during this phase.

Vows 2: Traci Connell Interiors, original photo on Houzz

  • Sheetrock. Holes made during rough-in will be patched, new Sheetrock will be put up at any new walls or ceilings, and texture will be applied to make your walls look like walls again.
  • Trim carpentry. There are a few different types of trim that may be installed at this phase: baseboard (which runs along the joint where the bottom of a wall meets the floor), door and window casing (which is installed around the perimeters of doors and windows) and crown molding (which is run along the joint where the top of a wall meets the ceiling). Trim is purely optional — some more contemporary designs forgo it entirely — but it is meant to create a finished, unified look.

Vows 3: TOTAL CONCEPTS, original photo on Houzz

  • Cabinetry. The installation of cabinetry is usually around the time when I see a little glimmer come back into a homeowner’s eyes. This is when the kitchen starts looking more like a kitchen, but it’s also when you can visualize how your other storage pieces, such as built-ins and bathroom cabinets, will change the function of your home.
  • Related: Shop for Kitchen Cabinets
  • Electrical and plumbing trim. This is the other big “wow” that comes with the finish-out phase. A master bathroom can start to look completed when tile and cabinetry is installed, but throw in a freestanding tub and a shower full of rain heads, handheld fixtures and a steam unit, and suddenly you’re not looking at a mostly done, unidentifiable space — you’re looking at your master bathroom.

The same goes for electrical items like decorative light fixtures or appliances. Seeing new stainless steel (or whatever your preferred finish is) appliances being brought into and installed in your kitchen make most people go starry-eyed and drool a little. No judgment here — I’ve done the same.

Vows 4: DKOR Interiors Inc. – Interior Designers Miami, FL, original photo on Houzz

  • HVAC trim. I mentioned in the last installment that most HVAC work is done during the rough-in stage, so what is left? Essentially, all that needs to be done is the installation of vent covers and thermostats and maybe a little tweaking of the air-conditioning system. Nothing too exciting, but it should be noted nonetheless.
  • Miscellaneous. Like I said, there is a lot that can be going on during the trim-out stage. Flooring — such as carpet, wood, tile or laminate — will be installed. (Flooring installers are known for insisting that they be the absolute last people to work on a house.)

Tile will go up in showers and as backsplashes. Countertops will go in. Priming and painting of walls, ceilings, trim and cabinetry will be completed. A little landscaping may even be done.

Vows 5: Viyet Luxury Consignment, original photo on Houzz

There are a million moving parts during the mechanical finishes phase. And I admit, as a homeowner and general contractor, this is exciting to see.

Just like during the Honeymoon, a lot of visibly quantifiable work is being completed. Only this time, instead of things being torn up and thrown out, they’re being brought in and installed. The puzzle pieces are finally fitting together, and you are starting to see the big picture. (Dreamy sigh.)

I’ve harped repeatedly about how communication is key, and this still rings true during the Renewal of Vows stage. But patience is also important.

As you see new things being carried in and installed, it can be so tempting to begin moving back into your new space or using your new kitchen. But your contractor may still need some time and space to work.

There are last-minute items that will ultimately guarantee your satisfaction that need to be taken care of before you and your family can begin enjoying your new remodel. So hang in there, and your patience will be rewarded.

Vows 6: Jay Jeffers, original photo on Houzz

You may be thinking: There can’t be anything left, can there? That’s it, right? Everything is installed, the house looks like a house again, time to move in and get settled. Not so fast. You’re almost there. Find out what final bits and pieces are involved in the end phase of a remodel, what I like to call the Happily Ever After stage.

By Hannah Kasper, Houzz

Housing Trends October 8, 2017

The 4 Phases of Remodeling: Happily Ever After

This fairy-tale phase of a home remodel is the tail end of any major project. The Honeymoon has come and gone. The Midproject Crisis has thankfully passed. The Renewal of Vows has given you the strength you need to continue on, and now we’re finally, and gratefully, just about out of phases. It’s time to wrap up this series on the ups and downs of remodeling by detailing the final few steps that are taken to complete a home remodel. What I call the Happily Ever After phase.

Ever After 1: Sophie Metz Design, original photo on Houzz

Whether you have experienced it, known someone who has gone through it or have only read about it, you’re probably familiar with what it’s like to be in love. Emotions run the gamut of excitement, happiness, giddiness and contentedness (as well as a wide range of others). The person in love is likely to be gushing about her beau or his sweetheart to anyone who will listen. It’s a time when even the most cynical of people looks at the world through rose-tinted glasses.

Moving back into a house after remodeling can be a bit like being in love. Are you not excited to use all your new appliances or plumbing fixtures? (Hello, new bathtub!) Is there not a smidge of giddiness as you think about coming home to your pristine new bathroom, kitchen or living room? Don’t deny it — you’re probably even babbling to the barista at Starbucks about your new space.

During this Happily Ever After stage, finally, the work is done! At last, there are no more nail guns and saws and vacuums making noise in your house. After months of destruction and disarray, it’s time to move back in and enjoy your home, sweet home, for the rest of your days (or at least until you sell it or remodel again). And though most of this phase is just you at last having the chance to enjoy the fruit of your general contractor’s labor, there are a few odds and ends that your contractor will be taking care of to make sure your Happily Ever After really lasts forever.

Ever After 2: chadbourne + doss architects, original photo on Houzz

  • Cleaning. This probably will happen before you move back into your home (or at least it should). Since day one of demolition, dust and debris have been thrown into the air and, much to your contractor’s chagrin, have crept into other places in the house that weren’t touched in the remodel. Now’s the time to do an all-inclusive clean. No, the cleaners won’t do your laundry for you, but they’ll do just about everything else, from polishing the floors to dusting the ceiling fans. The end-of-project clean is like a cleansing spa day for your home.
  • Final walk-through. The last walk-through ensures that you are completely satisfied with everything — and I mean everything — in your home. This is where you will have the chance to sit down and bring up all the odds and ends that you feel need to be addressed. This can be anything from “this faucet isn’t on straight” to “there’s a scratch on the new fridge” to “my shower isn’t draining correctly.”

    Contractors may vary on when they hold a final walk-through, but in my experience, it’s scheduled after the homeowners move back in and have a chance to use the new space. Your contractor should’ve caught just about everything during his or her own informal walk-throughs throughout the remodel, but sometimes there are items that just don’t come to the surface until a house is lived in.

Ever After 3: Collins & DuPont Design Group, original photo on Houzz

  • Warranty begins. Most builders and remodelers have a warranty for their projects. The length and amount of coverage can vary, of course, but what remains constant is the promise to stand behind their work for any unforeseen circumstances that arise and need addressing. (Side note: If you’re looking at contractors right now, ask them about their warranty. This can be very telling of how they conduct their business. The more that contractors are willing to warrant their work — or the longer the warranty — the more effort they will put into getting the job done right the first time.)

    For some contractors, the warranty formally begins after the final walk-through is hosted and the last payment is received. After that, some will stand behind any light fixtures that fizzle, appliances that break, tiles that come loose — you name it. In an ideal world, everything would work right the first time, and it would work right forever. In our world, however, there are bad manufacturing batches and recalls and oversights that may need to be taken care of. Fear not. If you have selected the right remodeler, these issues will be handled.

Related: How Builders Deal With Problems Beyond the Warranty

Ever After 4: Mark Hickman Homes, original photo on Houzz

What else is involved in the Happily Ever After? Absolutely nothing. Take a deep breath in, let it out, look around your new place and smile, knowing that it’s all yours, to have and to hold from this day forward, for better, for worse, for richer, for poorer, in sickness and in health, to love and to cherish till death do you part. You get the picture.

By Hannah Kasper, Houzz

Housing Trends October 6, 2017

5 Things Your Contractor Doesn’t Want to Hear

There are parts of every job, no matter what field you’re in, that are just less fun than others. Building professionals pride themselves on doing anything and everything to make clients happy. But that doesn’t always mean the builder is jumping up and down with excitement at every stage of a project.

Related: 10 Things to Discuss With a Contractor Before Work Starts

When it comes to remodeling and home building, contractors will do just about anything to make you happy. They’ll meet with you on short notice. They’ll come up with creative solutions to your unique requests. They’ll even clean your toilets if you ask (although maybe not for free).

Contractors may have a brave face on at all times, but I’ll let you in on a little secret: There are some things they just don’t like to hear. Such as …

Comments 1: Gepetto, original photo on Houzz

1. “I reselected my plumbing fixtures.” Most good contractors will harp on how important it is to get all your selections made as soon as possible. Some won’t even start a project until everything is selected. It’s a great practice, and it helps to keep your project going as smoothly as possible.

Related: Bathroom Sinks for Every Budget

So if you come to your builder in the middle of the project and say, “Hey, by the way, I chose all new plumbing fixtures for the master bathroom,” they might get a little nervous. Depending on what stage of work they’re in and what you reselected, this could be no big deal. Or it could mean doing a lot of extra work to prepare for the new fixtures. Even worse, there may be a lead time associated with your new selections. This could cause an unplanned stop in work, which nobody (homeowners, subcontractors, builders, neighbors) likes.

Comments 2: BCV ARCHITECTS, original photo on Houzz

2. “Can we hang this chandelier up there?” (Points to 20-foot-tall ceiling.) Why, yes! Yes, we can. I’ll just be sitting in the corner biting my nails as I watch my electricians stand on massive ladders that I (the person with the fear of heights) would never set foot on, all while they hold and hang a massively heavy and most likely expensive chandelier. But, yeah, we can definitely do that. No problem.

Related: Search Chandeliers by Style

There’s really no way to avoid challenges like this. But it helps to give your builder a heads up on out-of-the-ordinary needs you may have. That way, he or she can take extra precautions, such as setting up scaffolding, and warn you of any additional costs that your request could involve.

Comments 3: Buildwell, original photo on Houzz

3. “Can you meet at 5 p.m. this Friday?” Admittedly, I don’t think anyone likes to hear this. Contractors may work long hours and be available pretty much whenever you need them to be, but that doesn’t mean that they don’t want to go home a little early (or at least leave on time) on Friday to relax.

A great way to ensure you’ll have your contractor’s undivided attention is to set up recurring meetings. Find a time that works for both of you and save it in your calendars. That way, no one has to worry about last-minute, pre-weekend meetings.

Comments 4: Kasper Custom Remodeling, LLC, original photo on Houzz

4. “Let’s make all of the walls smooth!” I think smooth walls are beautiful. They’re crisp and clean and are a must in my book. I’ll say this much, though: They aren’t always easy. It’s one thing to hire a high-quality drywall contractor who is a pro at smooth finishes. It’s another thing entirely to have all involved parties be happy with the final product.

It’s kind of like If You Give a Moose a Muffin. It starts with one thing that needs to be fixed (“That corner isn’t perfectly square”) and seemingly overnight turns into a mile-long punch list detailing everything from millimeter-wide blemishes to areas of texture that look weird in a certain light. Like I said, I adore smooth walls, but getting them to a level of smoothness that everyone can agree on can be a bit of a task.

If you can find it within yourself to hold off on the nitpicking until your builder at least has the paint primer up (this is the stage when it’s easiest to see any remaining imperfections), you’ll save yourself and your builder a headache.

Comments 5: Barbara Bagot Architecture, original photo on Houzz

5. “Could you help me move [insert expensive item here]?” Grand pianos, $50,000 paintings, one-of-a-kind sculptures — you name it, I’m afraid of moving it. Asking remodelers to help you move something valuable to you (whether monetarily or emotionally) is asking them to take on a lot of liability.

While it may make sense to ask them for a little help — after all, they have plenty of crews, and they’re already at your house — it’s not worth the risk for any party involved. Your best bet is rephrasing the question to “Do you know anyone I could hire to help me move [insert expensive item here]?”

As I was speaking to my co-workers for their take on things contractors “hate” to do, it became apparent to me that, for the most part, there isn’t too much that we won’t do to make our customers happy. On top of that, there aren’t a huge number of things that make us shudder. (Notable exception: When someone used the toilet at a house where the water wasn’t on — yuck.)

There might be materials or tasks contractors try to avoid if they can, and some might even steer their customers away from certain things to make everyone’s life a little easier. (Our in-house designer avoids marble in kitchens at all costs because of its susceptibility to stains.) But in the end, we’re in the customer service game for a reason. We love to make people happy, and we’ll do whatever we can to facilitate that.

By Hannah Kasper, Houzz

Housing Trends October 5, 2017

At Home in the Outdoors

More than 80 percent of Americans say they want an outdoor living space where they can relax and entertain. And it’s no wonder why. Outdoor spaces extend your livable space, add visual interest, and increase not only your quality of life, but also the overall value of your home. (In some cases, the increase in your home’s value can cover most or all of the cost to create the new space.) Here are some options to consider:

DECK

Decks are still the most popular outdoor living spaces, not only because they work so well for entertaining and relaxing, but also because they have the highest return on investment (see the Tips column for data).

Surprisingly, wood decks (made of cedar or pine) are actually the better financial investment, because building with Trex or other popular composite products costs considerably more, yet doesn’t increase the home’s value by as much.

Expanding and reconfiguring your current deck is another option that’s popular today. The contractor will typically remove the old face boards, extend the underlying structure, and then put down the new decking. This is also an opportunity to add built-in furniture, privacy screens, even plumbing and electricity.

PATIO

Running a close second to decks – in both popularity and investment return – are patios. With a patio, you can relax and entertain at ground level, which can afford more privacy in urban areas, and allows you to be more engaged with the surrounding plants and landscaping.

Typically made of brick, concrete, or stone, a patio also comes with far fewer maintenance and repair issues than a deck. Plus, patios are generally easier and less disruptive to construct – which is why they’re often about 30 percent less expensive to have professionally built.

GAZEBO

For those who want even more privacy, as well as shelter from the sun and protection from mosquitoes and other pests, there’s the gazebo. Available with walls or as an open-air design, with screening or not, these modestly sized, affordable backyard structures can be built from scratch or purchased as a kit (for assembly by a do-it-yourselfer or a professional).

Popular in the Midwest for decades, gazebos have made their way west as homeowners here have discovered how nice and easy they are for creating a shaded spot for reading, relaxing, and backyard gatherings.

OUTDOOR KITCHEN

People tend to gather naturally in the kitchen. And when the kitchen is outdoors, it creates an ideal opportunity to mix, mingle and interact in the open air. Other reasons why cooking outdoors makes so much sense: less kitchen cleanup, the house stays cooler during the summer, and grilled food just tastes better.

Some may think an outdoor kitchen is only for cooks who host large parties, but homeowners who go this route say they’re more of an extension of the home, and great for daily use.

Designs for outdoor kitchens range from the simple (a grill, limited counter and cabinet space, and maybe a prep sink) to truly independent entities with a refrigerator, an elaborate grill, warming oven, freestanding island with storage space, rolling cart stations, and even a dishwasher. Depending on how elaborate your design, you may be able to list it as a second kitchen when selling your house.

SIX PLANNING SUGGESTIONS

  1. Before meeting with contractors, gather photos of designs and ideas that you like; this will make it much easier to communicate your ideas.
  2. Make sure the materials you plan to use, as well as the overall size of the structure, will be harmonious with your home’s current look and feel.
  3. Give serious consideration to a roof – which will likely add significantly to the cost, but will also provide much-needed shade on hot days and protection from rain and inclement weather. In fact, to ensure things are structurally sound and architecturally appealing, start with the design for the roof first, then set your sights on the roof supports and structure below.
  4. Incorporate lighting into your design, which will extend its usability into the evening and throughout the seasons.
  5. Consider convenience, comfort, and longevity when choosing materials. For example, a floor made of dirt or stepping stones may last forever, but one made of wood or concrete is much easier to clean and arrange furniture upon.

If you’re eager to live a healthier lifestyle and reconnect with family and friends, as most people are today, it’s time to consider an outdoor living space.

Housing Trends September 3, 2017

How to Combat the 5 Most Common Remodeling Monkey Wrenches

There’s a lot to think about, select and organize on a remodeling project, whether it’s a single room or a whole-house remodel. Small projects often have the same list of tasks as big projects, and the same potential for material selection and delivery to throw your schedule for a loop. Of course, anything can go wrong during a remodel, but some parts of your remodel will cause more difficulty than others.

Here’s what you should keep an extra-close eye on as you’re planning your remodel.

Monkey Wrenches 1Garret Cord Werner Architects & Interior Designers, original photo on Houzz

1. Windows and exterior doors. Window decisions can be some of the most difficult in a project. Windows come in a variety of materials and colors, with hardware in different styles and colors and even an array of screen options. They also have wildly varying lead times. Vinyl windows can arrive in as little as two weeks, while some wood-clad and solid wood windows can take 10 weeks or more to arrive.

Generally, your contractor will install your windows before interior work takes place. And exterior trim and siding can’t be installed before the windows, so they can have a big schedule impact if they don’t arrive on time.

Best practice: Select your window brand early in the process, use the lead time to count backward from when the windows need to arrive and then finalize the order with your contractor at least two to three weeks ahead of that ordering deadline. Confirming things like jamb size, tempering, energy code compliance, egress, obscured glass selection and more can lengthen the process.

Monkey Wrenches 2Ventana Construction LLC, original photo on Houzz

2. Cabinets. Similar to windows, cabinets affect a wide range of tradespeople who are lined up to work directly after their installation. Flooring, tile and countertop installations are all linked to the casework in kitchens and baths. Ordering cabinets requires multiple layers of design and selection, including decisions on the layout of the room; the function of doors, drawers and hardware; wood and paint; and crown molding. A field measure is also necessary.

Expect a floor plan and drawings showing how your cabinets will look straight on with complete measurements (also known as shop drawings). You’ll need to approve these before production can start.

Best practice: Narrow down the wood species and general style of the cabinets early on so that the biggest decisions are out of the way. Knowing the lead time from the cabinet shop is critical, and it doesn’t hurt to add an extra week to that to make sure your cabinets will arrive in time.

Related: How to Set Up Your Cabinets for the Best Storage

Monkey Wrenches 3ART Design Build, original photo on Houzz

3. Plumbing fixtures. All of today’s retail and online plumbing fixture stores make it seem like getting plumbing fixtures in time for an installation is easy. It often is, but some fixtures and manufacturers have factory lead times and limited availability.

Shower valves and bathtubs are the two elements you usually need for a plumbing rough-in. The rough-in could happen the first week of a bathroom remodel or a couple of months into a larger project. The rest of the fixtures can come late, but selecting these two ahead of time will make it easier to get the rough plumbing in correctly. If you’re using stone or another solid-surface counter that has an undermount sink, you’ll need to have the sink and faucet onsite during the template process.

Best practice: Don’t wait until the bitter end to choose your plumbing fixtures. If you do, at least one is bound to not show up when you need it, or to come with an exorbitant cost for overnight delivery.

Monkey Wrenches 4: Contemporary Bathroom, original photo on Houzz

4. Tile. When you select tile, you have to consider more than just aesthetics. You also need to make sure that the material you select has all the pieces necessary for installation (bullnose, pencil liner etc). Consult your architect and the tile setter if you’re not sure what you need. Still, sometimes the tile that arrives isn’t quite right. On one of our recent bath projects, one of the selected tiles was switched for another material because the colors of the delivered tile were not as expected. The dimensions and colors may not exactly match the sample you saw in the showroom, particularly with natural stone and slate. But even factory-made tile can vary from one lot to another.

Best practice: Try to get a sample from your local tile supplier’s warehouse to make sure the stock that will be delivered is what you expect.

Monkey Wrenches 5Noel Cross + Architects, original photo on Houzz

5. Flooring. The thickness of a flooring material affects many things, including the rough carpentry work that happens at the start of a project. If you want your floors to “plane out” (not have transitions up or down), making a definitive flooring decision is critical.

Many flooring materials, like wood and Marmoleum, have a lead time for arrival. Then these materials need to acclimate and adjust to the ambient temperature and humidity in the house. If flooring is installed without acclimating, it can expand or contract, causing gaps or bulging in the flooring. Usually four to five days are enough, but some products need two weeks of acclimation.

Carpeting can go in without acclimating at the very end of the project. However, interior millwork is installed in different ways, and there are different orders depending on whether you choose carpeting or some other flooring material.

Best practice: Choose your flooring before your project starts so that your contractor can make the surfaces plane out, and so that lead and acclimation times are not an issue.